AREMILLION.COM

                         

 Home Up Feedback Contents Search Outside Links Info Reports General Contacts

 

Home
Up

Mobile emergency dike proposal

Borrowing technology, developed in 2001 for a salt water port expansion, a proposal has been put forth to develop a mobile dike system.

Preliminary models have been demonstrated and have shown potential.

Engineering consultations on models will begin in mid summer 2009, Date to be determined with the availability of the engineering team in Kelowna.

Partners wishing to assist in the development will need authorization to consult with the engineering team

 

Key Benefits

bulletRapid deployment
bulletLow cost per meter
bulletMinimal skill requirements for install

 

     
     
     
     

Partner Information Request Form

Select the items that apply, and then let us know how to contact you.

Send product literature
Send company literature
Have an engineer contact me

Name
Title
Company
Address
E-mail
Phone

 

Home ] Up ]                       

Copyright 2009 Aremillion