AREMILLION.COM

                         

 Home Up Feedback Contents Search Outside Links Info Reports General Contacts

 

Home
Up

FOR IMMEDIATE INTERNAL RELEASE

Mobile emergency dike

Development begins on floodwater containment

Borrowing technology developed in 2001 for the salt water port expansion a proposal has been put forth to develop a mobile dike system.

Preliminary models have been demonstrated and have shown potential.

Engineering consultations on models will begin in mid summer 2009, Date to be determined with the availability of the engineering team in Kelowna.

Partners wishing to assist in the development will need authorization to consult with the engineering team

For More Information Contact:
 

Bret Wiseman, Research Director
Aremillion
Salmon Arm, British Columbia, Canada
Tel: Private Listing
FAX:
Internet: web@aremillion.com

 

Home ] Up ]                       

Copyright 2009 Aremillion